TTC St. Clair West Station Renovation

Toronto, ON

Banner IMG_1202 copy Faeture_11 Feature_01 Feature_02 Feature_03 Feature_04 Feature_05 Feature_06 Feature_07 Feature_08 Feature_09 Feature_10

Client

Toronto Transit Commission

Industry

Transit

Completion Date

2017

Contract Type

General Contractor

Value

$15M

More About TTC St. Clair West Station Renovation

St Clair West Subway Station is an underground station on TTC’s Line 1 that was originally constructed in the 1970’s. The station, located at St Clair Ave West and Bathurst St, is situated on a constrained site in an existing, mature neighbourhood and serves more than four surrounding communities. As part of the TTC’s modernization program, the station required significant upgrades to accommodate full accessibility (Easier Access), including the addition of automatic sliding doors, accessible fare gates, and three new elevators.

J.J. McGuire was engaged by TTC to provide construction services for the complex renovation. The project included the installation of new elevator shafts and elevator mechanical spaces for three new elevators – one from street level to concourse, and two from concourse to track level. The project also included links into the existing walkways, as well as new HVAC systems, fire alarms, and sprinkler system for the overall station.

The constrained site required extensive logistics planning and coordination to maintain safe public access to the operational station and surrounding businesses. The J.J. McGuire team worked closely with TTC and surrounding retailers, whose spaces were impacted by the construction. Daily coordination of just-in-time deliveries mitigated the schedule and site impacts of minimal staging areas. Work on the overhead of passenger areas inside the station was conducted during off-hours and required specialized hoarding to ensure public safety while the station was operational. Specially designed hangar bolts for the inverted bridge required extensive quality assurance and control. Pull-out tests were performed on each bolt and robust quality records were maintained by the J.J. McGuire team in coordination with TTC.