University of Toronto Greenhouse

grennhouse

University of Toronto - Greenhouse Facility

Client
University of Toronto

Architect
Barry Bryan Associates (1991) Limited

Project Completion
December 2002

Description
The Greenhouse Facility is to replace the historic greenhouses located at College and University. The new 15,000 sf steel and glass enclosure is located on top of the roof of the existing Botany Building and flanks each side of the rooftop penthouse.

The Soils Facility is located on the south wing of the Geology Department.

  • Greenhouse Area: 910 m²
  • Soils Facility Area: 167.7 m²

The additions were constructed while maintaining daily activities within occupied areas.

Trent University

jj mcguire

Trent University Thorton Road Campus

Client
Trent University

Architect
Barry Bryan Associates (1991) Limited

Consultant
Kirkland Engineering Ltd. & OTS Engineering Ltd.

Project Completion 
September 2010

Description

J. J. McGuire has completed two projects with Trent University.

One being the renovations/upgrades to four floors of washroom/shower facilities at Trent University in Peterborough, Lady Eaton College dormitory and office space.

The second being the construction of the new Trent University, Oshawa Campus. This included (2) new additions to an existing elementary school and renovations to the original building to create a refreshed innovative learning center. This project was a fast-paced, time sensitive project that was completed on time and on budget. The project took (4) months to complete.